Gentofte Sports Park – September – october 2015
OSCON installed – as a subcontractor for c.c. contractor A/S – 4100m2 sports floor, divided into a Show Hall of 2100 m2 and a Training Hall of 2000m2. The floor is Engineered Ash, installed on our COMB III subconstruction.
Latest News
[advps-slideshow optset="5"]
Flooring Products
Solid sports parquet
Solid plank flooring
Installation systems
Contact
KTL Asia
+603 3149 3128
KTL Europe
+45 4432 8450
Send e-mail